Timer
Shut-in, open and afterflow timers, edited remotely and logged. Recovery control extends shut-in after missed arrivals instead of chasing a plunger that is not coming.
Every well, day one
Remote control and automatic optimization for plunger lift wells, on the controller already at the well.
High-frequency pressure data and AI keep the well tuned as conditions change.

30 minutes
Typical setup per well
3 control modes
To optimize each cycle
10 points per second
Pressure data
Integrate with the controller you have, or use ours to connect directly to your valves.
01 / Integrate with your controller
Connect Amplified to your existing plunger controller to add remote monitoring, control and optimization to the equipment already on your well.
Existing controller + Amplified
02 / Use our controller
Use Amplified’s own plunger controller to connect directly to your valves and manage the well through the Amplified platform.
Amplified controller → Your valves
High-frequency pressure data with open, arrival and close stamped on every cycle. This is the data smart mode runs on.
Pressure (psi)
Time
| Cycle | Open | Arrival | Close | Trip | Peak tubing |
|---|---|---|---|---|---|
| Cycle 1 | 12:30 | 12:34:30 | 12:40 | 4.5 min | 146 psi |
| Cycle 2 | 13:00 | 13:04:30 | 13:10 | 4.5 min | 146 psi |
| Arrival | Trip | Duration against the good window | Grade |
|---|---|---|---|
| 21:5309/09/26 | 2m 35s | Fast arrival | |
| 21:2109/09/26 | 2m 44s | Good arrival | |
| 20:4809/09/26 | 2m 41s | Good arrival | |
| 20:1609/09/26 | 2m 50s | Good arrival | |
| 19:4409/09/26 | 3m 02s | Good arrival | |
| 19:1209/09/26 | 3m 16s | Good arrival | |
| 18:4009/09/26 | 3m 27s | Slow arrival | |
| 18:0809/09/26 | 2m 53s | Good arrival |
The arrival ledger grades each trip fast, good or slow. Fast and slow trips, plus too many missed arrivals, reach your team by app, SMS or call.
Start with the timer logic your operators already know, add pressure-based control, then let the well’s own physics set the pace. Switch from the dashboard at any time.
Shut-in, open and afterflow timers, edited remotely and logged. Recovery control extends shut-in after missed arrivals instead of chasing a plunger that is not coming.
Every well, day one
Open on the casing-to-tubing differential or on pressure build, so the well cycles when it is ready. Fewer wasted trips, fewer fast hits.
Modbus-class controllers
A well-specific SPE model reads high-frequency pressure data and sets the arrival speed that balances production against plunger wear, then adjusts cycle times to hit it.
Only from Amplified
Pick a method, set your limits and switch on smart mode. Amplified reads every arrival against your fast and slow thresholds and nudges shut-in and afterflow toward the target, one step at a time.
Each change is written to the control history next to the ones your operators make, so you always know who did what and why.
Plunger cycle phases
Current control settings
Smart mode · 30-minute cycle
System AI and operators, one ledger
| Command | Settings | User | Time |
|---|---|---|---|
| Update plunger cycle | Shut-in 19m 00sOpen 6m 00sAfterflow 5m 00s | System AI | 9/9/2026, 4:30 PM |
| Update plunger cycle | Shut-in 20m 00sOpen 6m 00sAfterflow 5m 00s | Wade McAllister | 9/9/2026, 3:07 PM |
| Update plunger cycle | Shut-in 23m 00sOpen 6m 00sAfterflow 5m 00s | System AI | 9/9/2026, 2:45 PM |
| Update plunger cycle | Shut-in 20m 00sOpen 6m 00sAfterflow 5m 00s | Cody Harlan | 9/4/2026, 2:03 PM |
| Close | Not available | Cody Harlan | 9/4/2026, 1:44 PM |
| Update plunger cycle | Shut-in 20m 00sOpen 6m 00sAfterflow 5m 00s | Travis Whitaker | 9/3/2026, 1:47 PM |
| Open | Not available | Travis Whitaker | 9/3/2026, 1:38 PM |
| Close | Not available | Travis Whitaker | 9/2/2026, 1:30 PM |
Upgrade your field of legacy controllers in a couple days.

Everything on the dashboard is in the Amplified app. Switch modes, change timers, read pressures and take alerts by push, SMS or call.

Two wireless pressure devices, a gateway, the Amplified Plunger Box and a solar kit. Explore the hardware and take control of the next cycle.
Your controller. Every cycle, in view.
Tune the cycle toward a target arrival time using pressure and the last plunger trip.
Commands apply now. Lift Factor control continues.
Last arrival: 180 sec · Good
Swipe to explore the well. Tap a device for details.
Works with Timekeeper, Trilift, Flowco, PCS, Megalift and other common controllers, with any arrival sensor.
Every card of every stroke, downhole cards derived from surface data, and control that changes what the well is doing.
Real time ultra high resolution data on your ESP, alarms, control, on the same platform as the rest of your field.
Automatic gas lift optimization with remote injection control, continuous and intermittent operation, and valve diagnostics all connected to measured production.